The AQMD's currently posted comment letters are shown in the table below. Our goal is to post all letters on current projects in the near term.
To inquire about the AQMD's comment letters on any other project please contact Larry Robinson at (916) 874-4816 or lrobinson@airquality.org.
| Project | Project Description | AQMD letters |
|---|---|---|
| Cal Waste Recycling Processing Center | The City is considering a Conditional Use Permit for a recycling processing center that would be located in an existing 97,000 square foot building in the Galt Industrial Park. | Comment Letter 03/22/2012 (PDF) |
| City of Galt Bicycle Transportation Plan 2011 | The City's Plan has been updated to enhance Galt's local and regional bikeway network, to encourage safe recreational bicycling, and to create an environment to encourage bicycle commuting. The Plan was adopted on March 1, 2011. | Bicycle Transportation Plan comment letter 02/24/2011 (PDF) |
| City of Galt General Plan Update | This document updates the City's long range plan for growth and development. | Draft EIR comment letter 09/02/2008 (PDF) Final EIR comment letter 03/31/2009 (PDF) LAFCO on SOI application 08/27/2009 (PDF) LAFCO SOI DEIR 08/03/2010 (PDF) |
| City of Galt Parks Master Plan Update | Master plan document covering existing and future park development through the year 2025 | Comment letter 06/23/2010 (PDF) |
| City of Galt Utility Master Plans Initial Study/Mitigated Negative Declaration | The City is conducting an environmental review for 3 utility master plans that were developed in 2010: storm water, waste water and drinking water. | MND Comments 04/09/2012 (PDF) |
| Simmerhorn Commercial | A conceptual plan to develop 44 acres of highway commercial property, with no more than 500,000 square feet of commercial uses, on the east side of Highway 99 in central Galt. | Mitigated Negative Declaration comment letter 01/25/2012 (PDF) |
| South County Transit Link Short Range Transit Plan | Updated transit plan that covers south Sacramento County and the City of Galt. | Comment letter 01/03/2012 (PDF) |
| Twin Cities Road Highway 99 Interchange Improvements | The City of Galt is planning interim improvements to the interchange of Twin Cities Road and Highway 99 to reduce existing and future congestion, improve bike and pedestrian pathways, and improve ADA accessibility. An Initial Study/Mitigated Negative Declaration for the project was released in June 2011. | MND Comment Letter 07/12/2011 (PDF) Air Quality Study Report comment letter 09/30/2010 (PDF) |
| WalMart |
A proposed 132,000 square feet super center to be located on 11 acres at the intersection of Twin Cities and Fermoy Roads. |
Comment Letter 09/25/2007 (PDF) DEIR comment letter 01/04/2010 (PDF) FEIR comment letter 03/23/2010 (PDF) |
Additional information on projects currently in the planning process in Galt is available at www.ci.galt.ca.us.



